Groundworks to new anaerobic digestion plant on a greenfield site, incorporating the construction of three silage storage clamps each 9500m2 in area, groundworks to tank bases and the construction of various reinforced concrete structures.  The original plant was commenced in 2014 and since been extended to incorporate a further two production areas, where the gas produced is used to power large engines which feed electricity into the grid.

Client
Pretoria Energy

Design Team
Arthur Consultancy

Completion Date
On going

Value
£7.5 Million